AI features are on the Plus, Pro and Lifetime plans, and there are two ways to run them. The Sync plan has no AI on either path: it is sync and sharing alone. If you would rather not see AI at all, you can turn it off.
Grape AI
Included with the Plus and Pro subscriptions. Nothing to configure, no keys to manage, no separate provider bill. When Plus or Pro starts and no other provider is set up, Grape switches its own models on for you in Settings under Models, and chat, transcription, search and the study tools all work.
Plus answers on Grape's standard model. Pro answers on the best one with twice the allowance, and if a month's use of the best model runs out, the chat carries on with the standard model rather than stopping. Grape Pro Image Model, which draws the images in the chat, the pictures in a slide deck and the infographics, comes with Pro only; on Plus those take an image model on your own key.
- Work starts on the 14th and takes two weeks.
- The sink moves under the window.
- Green tiles, the ones from the second shop.
- Nobody has priced the new worktop yet.
- The electrician is only free in March.
- Do we need a permit for the wall?
- Start: is on the 14th, about two weeks for the kitchen.
- The sink: moves under the window, which costs less than expected.
- Tiles: are the green ones from the second shop.
- Work starts on the 14th and takes two weeks.
- The sink moves under the window.
- Green tiles, the ones from the second shop.
- Nobody has priced the new worktop yet.
- The electrician is only free in March.
- Do we need a permit for the wall?
- Start: is on the 14th, about two weeks for the kitchen.
- The sink: moves under the window, which costs less than expected.
- Tiles: are the green ones from the second shop.
- Work starts on the 14th and takes two weeks.
- The sink moves under the window.
- Green tiles, the ones from the second shop.
- Nobody has priced the new worktop yet.
- The electrician is only free in March.
- Do we need a permit for the wall?
- Start: is on the 14th, about two weeks for the kitchen.
- The sink: moves under the window, which costs less than expected.
- Tiles: are the green ones from the second shop.
- Work starts on the 14th and takes two weeks.
- The sink moves under the window.
- Green tiles, the ones from the second shop.
- Nobody has priced the new worktop yet.
- The electrician is only free in March.
- Do we need a permit for the wall?
Your own API key
Available on Plus, Pro and Lifetime. Open Settings, go to Models, enable a provider, paste your key and add the models you want from the ones it offers you. Grape supports OpenAI, Anthropic, Google AI Studio, Groq, DeepSeek, xAI, OpenRouter, and any OpenAI compatible endpoint as a custom provider. On desktop you can also run local models through Ollama or LM Studio.
- Work starts on the 14th and takes two weeks.
- The sink moves under the window.
- Green tiles, the ones from the second shop.
- Nobody has priced the new worktop yet.
- The electrician is only free in March.
- Do we need a permit for the wall?
- Start: is on the 14th, about two weeks for the kitchen.
- The sink: moves under the window, which costs less than expected.
- Tiles: are the green ones from the second shop.
- Work starts on the 14th and takes two weeks.
- The sink moves under the window.
- Green tiles, the ones from the second shop.
- Nobody has priced the new worktop yet.
- The electrician is only free in March.
- Do we need a permit for the wall?
- Start: is on the 14th, about two weeks for the kitchen.
- The sink: moves under the window, which costs less than expected.
- Tiles: are the green ones from the second shop.
- Work starts on the 14th and takes two weeks.
- The sink moves under the window.
- Green tiles, the ones from the second shop.
- Nobody has priced the new worktop yet.
- The electrician is only free in March.
- Do we need a permit for the wall?
- Start: is on the 14th, about two weeks for the kitchen.
- The sink: moves under the window, which costs less than expected.
- Tiles: are the green ones from the second shop.
- Work starts on the 14th and takes two weeks.
- The sink moves under the window.
- Green tiles, the ones from the second shop.
- Nobody has priced the new worktop yet.
- The electrician is only free in March.
- Do we need a permit for the wall?
- Start: is on the 14th, about two weeks for the kitchen.
- The sink: moves under the window, which costs less than expected.
- Tiles: are the green ones from the second shop.
Four kinds of models
The Models tab separates chat models, transcription models, image models and indexing models, because they do different jobs. Chat powers the assistant and writes mini apps, transcription turns audio into text, an image model generates the images the chat asks for and the pictures in a slide deck, and indexing builds the semantic search index. Add and switch on one of each from whichever providers you use.
Changing your mind
Switch providers whenever you like. The notes themselves do not depend on which model you used, so nothing needs converting when you move from one provider to another.